After a fire burnt Milliken & Co’s Georgia factory to the ground, a timeline of six (6) months was established to restore their twenty-five (25) acres under roof operation to production to meet global demand. This was one of the largest engineering projects globally at the time, with the re-build cost of an estimated half a billion US dollars.

A Systems view approach was used to design the optimised factory layout for production output and safety. Applied Robotics managed all the automation of Carpet Tile handling which included:

– Custom design of Eight Specialty Machine lines leveraging Applied Robotics proprietary Vacuum Conveyors.
– Assisted in the Project management of over 2500 Engineers and technicians
– Organisation of a Global Logistics network capable of moving equipment weighing up to 2500 tonnes within six months.

Following the success of these first lines, duplicates of Applied Robotics’ unique machines were installed in Milliken’s UK and Japanese factories.

EXPEDIATED
PROJECT
EXECUTION
TO ENSURE
SUCCESSFUL
ON-TIME
DELIVERY

Propriety Limited Technology that Delivers

Previously it took robots twelve (12) seconds to stack a single tile. Applied Robotics designed and developed custom vacuum conveyors that stacked four (4) tiles per second.

Minimal Operator Monitoring

Collaborative approach with all Milliken Stakeholders

“The Applied Robotics System was the solution we had been looking for to meet our production demands”